Can you protect damaged roofs, windows and doors?
Yes. We assess emergency roof protection, tarping, temporary board-up and other measures to protect exterior openings. The method depends on the roof or wall system, damage, access and site conditions. Call with the property address and a description of the openings so we can confirm the initial scope and response availability.
Do you also handle water damage caused by wind-driven rain?
Yes. Water extraction, mitigation, moisture assessment and structural drying remain central to the response. Roof, window, door or wall damage can allow water into several rooms or floors. We coordinate temporary exterior protection with interior mitigation and drying so the recovery addresses both the opening and the affected materials.
Do we have to be enrolled in the PDP program?
No. You can request emergency services or discuss an MSA without enrolling in a Pre-Disaster Plan. PDP is a separate option for owners who want a more detailed, ongoing facility planning program.
What records can support the property and claim file?
The agreed scope can include condition photos, affected-area records, moisture readings, drying progress, labor and equipment documentation, and approved changes. Share your adjuster's contact and requested documentation with the project team. Coverage and claim decisions remain with the insurer.
How quickly can work start?
Timing depends on the location, safe access, the condition of the building, signed authorization and available crews and equipment. Call for a property-specific assessment. A website inquiry alone is not a dispatch confirmation.
Can you coordinate a school, municipal campus or multiple buildings?
Yes. Provide the building list, authorized contact for each location, essential operating areas and any restricted-access requirements. We review damage and priorities by building and define the scope, communication and documentation process with the responsible team. Safe access, work authorization and resource availability determine the mobilization plan and sequencing.